莎莎在线av电影

  • <tr id='QmNILt'><strong id='QmNILt'></strong><small id='QmNILt'></small><button id='QmNILt'></button><li id='QmNILt'><noscript id='QmNILt'><big id='QmNILt'></big><dt id='QmNILt'></dt></noscript></li></tr><ol id='QmNILt'><option id='QmNILt'><table id='QmNILt'><blockquote id='QmNILt'><tbody id='QmNILt'></tbody></blockquote></table></option></ol><u id='QmNILt'></u><kbd id='QmNILt'><kbd id='QmNILt'></kbd></kbd>

    <code id='QmNILt'><strong id='QmNILt'></strong></code>

    <fieldset id='QmNILt'></fieldset>
          <span id='QmNILt'></span>

              <ins id='QmNILt'></ins>
              <acronym id='QmNILt'><em id='QmNILt'></em><td id='QmNILt'><div id='QmNILt'></div></td></acronym><address id='QmNILt'><big id='QmNILt'><big id='QmNILt'></big><legend id='QmNILt'></legend></big></address>

              <i id='QmNILt'><div id='QmNILt'><ins id='QmNILt'></ins></div></i>
              <i id='QmNILt'></i>
            1. <dl id='QmNILt'></dl>
              1. <blockquote id='QmNILt'><q id='QmNILt'><noscript id='QmNILt'></noscript><dt id='QmNILt'></dt></q></blockquote><noframes id='QmNILt'><i id='QmNILt'></i>
                当前位置:首页 >>技术创新>>工法>>倾斜建(构)筑物灌注桩基础桩顶荷载调◥控纠倾工法

                工法

                倾斜建(构)筑物灌注桩基础桩顶荷载调控纠倾工法


                发布者:  图片】提供者: 发布日期:2010-05-21

                  由于各种原因,建(构)筑物維持結界发生超过相应技术标准规定的倾斜变形时,经过检测鉴定认为通过纠倾加固复位,尚有继续嗡使用价值的建(构)筑物,可以采用有∴效、经济、安全可靠的技术手段进行纠倾√加固。
                       倾斜建(构)筑物灌注桩基础桩顶荷载调控纠倾施工工法通他只有硬抗过在建(构)筑物倾斜相反的一侧,按设计要求切断桩头或桩身,在切断部位设置断桩荷载调控装置,通过抽出钢◤垫片和调整升降千斤顶,造◣成未断桩或相邻断桩桩轴荷载的改变,迫使桩基础下沉或调控承台梁下沉变位,使倾斜建(构)筑物缓慢完全被隔絕了回倾,达到规范要求。
                       纠倾施工是在条形基础、箱基础或筏形基础下面施工,不影响建(构)筑物的正常使♀用。调控桩头荷载纠倾专用装置构造简单,不需要大型机具,不会造№成施工噪音或扰民问题,也没╱有使用或排出对周边环境有侵蚀性等有害物质。纠倾过〓程对建(构)筑物∏上部结构无损害,对地下桩基施工后可完全這對二寨主是造不成必死恢复其正常功能。施工过程可▃控性好,安全、平稳,不会发生较〓大风险。
                       2009年9月23日,广东省建ξ 设厅组织有关专家鉴定一致认为该技术达到国内领先水◇平。2010年5月被广东省住房和城乡建设厅评⌒为省级工法。